HYDROMOLE technology

Cable services

Subsea cable system solutions

At OEG, we provide comprehensive expertise in the planning, design, construction and delivery of subsea cable system solutions, providing the personnel, experience and equipment to support our customers' project needs.

Cable service engineers on beach
cable pull in

Subsea cable pull in

Subsea cable pull in

Cable pull in termination and testing for offshore wind farms

As a leading provider in the cables and renewable energy sector, we bring unparalleled expertise and cutting-edge solutions to ensure the successful installation and integration of cables within your offshore wind farm infrastructure. Our team comprises industry experts with first hand knowledge in engineering, project management and operational management in export and inter-array cable pull-ins.

We perform both cable pull-in and termination & testing services as an integrated package to achieve efficiency gains in cable installation for both bottom-fixed and floating offshore wind turbines. This reduces the project’s overall risk and capital expenditure (CAPEX).

Shore end cable installation

At OEG, we specialise in the provision of turnkey project support for the installation of onshore and nearshore power and fibre optic cable shore ends, from the Cable Laying Vessel (CLV) cable chute to the land termination point.

Our extensive track record of successful shore end cable installation projects, often in difficult environmental conditions and challenging locations, gives us the knowledge and experience to manage a wide range of shore end pull in operations across the energy industry.

With a commitment to excellence, innovation and sustainability, our services cater to diverse industries and clients, ensuring seamless power and data transmission shore end to shore end

Cable trencher
cable installation

Tracked subsea trencher

The tracked subsea trencher system is a purpose built, self-propelled, all terrain, shallow water vehicle. The trencher is typically deployed for the post lay trenching and burial of subsea power, telecoms and flexible products (umbilical and pipe) located in the dynamic environment of the intertidal splash zone out to water depths up to 50m dependant on soil conditions and project specifications.

Cable route engineering

At OEG, our route engineers can call on over 25 years of experience in the successful design, planning, survey and installation of subsea cables. This expertise has been gained on a variety of projects in the offshore energy sector, from small cables projects, through to large transoceanic and multi country network systems.
Sea view
Team at Wind Energy Hamburg

Want to find out more?

Our team of technical experts are here to support you.